lundi 2 septembre 2013

Four Thoughts on the Nature of Project Rework

A lire sur:  Tenstep


Rework refers to the time spent correcting deliverables that you thought were already complete and correct. Strictly speaking, if you have a rigorous quality process in place, there should be no reason for rework. In fact, rework is the result of not having rigorous enough quality processes in place. But, let's be practical as well. No project can afford to spend the time and effort that would be required to guarantee that every deliverable is perfect the first time. Even a company operating at a 'Six Sigma' level has some small probability of error.
There are a few things to keep in mind about rework.
  • Rework is not the same as your normal process of reviewing deliverables. If you create a document and you circulate it to gather feedback, the resulting changes are not considered rework. These changes to the document are your way of making sure that you have a good document to begin with. However, if you finalize the document and then find errors in the content later, the resulting updates would be considered rework.
  • Focus on finding rework items it as early in the project as possible. Errors that are undiscovered early in your project will likely propagate into more errors later in the project. The later the errors are uncovered, the more costly and time-consuming they are to correct. 
  • You can track rework to determine how much of your project is spent “thrashing” or working on the same problems twice. When you encounter errors or defects in your project, try to classify them as "normal" errors that are a part of building the deliverables, or rework on deliverables you thought were already complete.
  • Rework is not the same as a scope change. Rework is caused by problems in the quality management process. Rework is needed to bring a deliverable up to the level of quality it should have been at to begin with. Scope change refers to modifying part of the solution because of a new requirement. The effort and cost associated with rework needs to be absorbed by the project. Effort and cost associated with scope changes should be agreed to and paid by the client.
Although you may accept rework as part of the nature of the project, it does not mean the project manager and project team should not strive to eliminate it. Your goal should always be to eliminate defects and rework by continually improving your processes.
News from Max Wideman (www.maxwideman.com)

1 commentaire:

  1. I really appreciate information shared above. It’s of great help. If someone want to learn Online (Virtual) instructor lead live training in SIX SIGMA , kindly contact us http://www.maxmunus.com/contact
    MaxMunus Offer World Class Virtual Instructor led training on SIX SIGMA . We have industry expert trainer. We provide Training Material and Software Support. MaxMunus has successfully conducted 100000+ trainings in India, USA, UK, Australlia, Switzerland, Qatar, Saudi Arabia, Bangladesh, Bahrain and UAE etc.
    For Demo Contact us.
    Saurabh Srivastava
    MaxMunus
    E-mail: saurabh@maxmunus.com
    Skype id: saurabhmaxmunus
    Ph:+91 8553576305 / 080 - 41103383
    http://www.maxmunus.com/

    RépondreSupprimer