Requirements Management Plan
describes how you will elicit, analyze, document and manage the
requirements of the project. This plan will cover the up-front gathering
of high-level project and product requirements, as well as the more
detailed product requirements that you will collect during the project
lifecycle. This plan should especially focus on how you will manage
changes to the requirements after they have been originally approved.
Sections of the plan could include the
following information:
-
The requirements gathering process. In this section you will describe the process that you will use to elicit, analyze and document the requirements.
-
Roles and responsibilities. This section lists the roles that will be involved with managing the requirements through the rest of the project lifecycle. Roles could include the project manager, lead analyst, clients, etc. The project manager, for instance, should have the overall responsibility for scope change management of the requirements. Someone, perhaps the lead analyst, should have overall responsibility for the integrity of the requirements throughout the rest of the lifecycle.
-
Tools. Describe any automated tools that will be used to manage the requirements. There are a number of tools that can be used to document, manage and track requirements throughout the lifecycle.
-
Requirements traceability. If your project team is tracking (tracing) requirements from Analysis to Design and through the rest of the lifecycle, the overall process should be described here. This process should then be added to the schedule to ensure the proper tracking of requirements occurs throughout the rest of the project.
-
Change control. There should be a formal process to manage changes to the requirements. Hopefully, the entire project is using a formal scope change process. If so, then this overall scope change process should be specifically applied to the changes in requirements. If there is no formal overall scope change process, a specific change control process should be documented here.
Adhering to a Requirements Management Process helps the project team
focus on the requirements that have been developed and maintains the
integrity of the requirements throughout the lifecycle of the project.